5 Characteristics of Successful Work Groups (at Google)

Google’s internal study of work groups found that successful teams are made of reliable, engaged workers who feel psychologically safe to take risks. Keeping this in mind the next time I introduce a group project.

We learned that there are five key dynamics that set successful teams apart from other teams at Google:

  1. Psychological safety: Can we take risks on this team without feeling insecure or embarrassed?
  2. Dependability: Can we count on each other to do high quality work on time?
  3. Structure & clarity: Are goals, roles, and execution plans on our team clear?
  4. Meaning of work: Are we working on something that is personally important for each of us?
  5. Impact of work: Do we fundamentally believe that the work we’re doing matters?

If you answered “yes” to the five questions above, congrats! You’re probably on a high-performing team. And if not, not all hope is lost. This is a shortcut to help you figure out where to focus, how to get better, and a way to talk about this concept with your teammates in a structured way. —re: work

Post was last modified on 2 Aug 2017 9:59 pm

View Comments

Share
Published by
Dennis G. Jerz

Recent Posts

The choreographer daughter is doing a thing.

The choreographer daughter is doing a thing.

2 hours ago

So I’m starting a thing. Wish me luck. #blender3d #medieval #york #mysteryplay #corpuschristi

So I’m starting a thing. Wish me luck. #blender3d #medieval #york #mysteryplay #corpuschristi

7 hours ago

No interior yet. Getting there. Gotta start somewhere. Low-poly background detail for a medieval theater project. #blender3d

No interior yet. Getting there. Gotta start somewhere. Low-poly background detail for a medieval theater…

13 hours ago

This is manageable. Far better than some semesters.

This is manageable. Far better than some semesters.

1 day ago

Creating textures for background buildings in a medieval theater simulation project. I can always improve this later. #blender3d

Creating textures for background buildings in a medieval theater simulation project. I can always improve…

2 days ago

Yesterday my stack of unmarked assignments was about 120, so this is not bad.

Nothing in this stack is pressing, but they do include rough drafts of final papers,…

3 days ago